Pages Menu
Categories Menu

Kizomba Satellites pj

Project  Name: Kizomba Satellites pj
End Client: ExxonMobile
Start Date: October 13, 2009
January 12, 2010
End Date: December 23, 2009
July 21, 2010
Vendor(s) Name: Metalcam spa
Vendor(s) Location: Brescia Italy
On Site Duties: Stages of processing and monitoring required on the following materials: RAW-FORGE
Heat Treatment (Normalizing)-Heat Treatment (Austeniteze) -Heat Treatment (Quench and Temper  Hardness Test on piece After Heat Treatment – Mechanical and Metallography Test – Machining. Visual and Dimensional Check -Ultrasonic Test -Magnetic Particle Test – Final Hardness Test -Marking and Packing -Material Certification
Reporting Duties:
During the manufacture of this product, each phase has been checked and verified step by step.
According To Specification and Quality Control Plan and customer requirements:
Documentation Review of Document for client approval, of DWG, of fabrication and inspection progress
NDT operator qualification, Instrument Calibration.
Incoming Heat check of mill certificate.
after verifying all documents, including raw material, we proceed to cut, where required, after the forming of the piece, you run the final heat treatment.
Sampling test selection and mechanical testing.
Verification of all non-destructive testing to be performed; ferrite cont,  UT & MT, visual and dimensional, final marking.
Protection and packing check.
Review of final documentation