WORK EXPERIENCES :
General: A 30 years’ work experience in shop inspection and expediting for the Oil, Gas, Petrochemical, Water treatment and Power industries.

 

Kizomba Satellities
Project Name: Kizomba Satellities
End Client: ExxonMobil
Start Date: November 11, 2009
January 11, 2010
End Date: December 18, 2009
July 21, 2010
Vendor(s) Name: Forgiatura Mame’ Spa
Vendor(s) Location: Brescia Italy
On Site Duties: Stages of processing and monitoring required on the following materials:
RAW-FORGE STRAIGHT.
Heat Treatment (Normalizing)-Heat Treatment (Austeniteze) -Heat Treatment (Quench and Temper Hardness Test on piece After Heat Treatment – Mechanical and Metallography Test – Machining. Visual and Dimensional Check -Ultrasonic Test -Magnetic Particle Test – Final Hardness Test -Marking and Packing -Material Certification.

 

seamless steel tube
seamless tubing
seamless pipes
seamless pipe manufacturers
stainless steel pipe manufacturers
stainless steel 316 – gas fittings
gas pipes
gas line pipe
gas tubing
seamless steel pipe manufacturing process
gas natural on line
TAMAR
Project Name: TAMAR
Start Date: March 15, 2010
Job Title: Team Leader for Mill Production Inspections
Vendor(s) Name: Tenaris Dalmine.
On Site Duties: Hold Point & Witness Inspections for Steps as Follow:
PRE-PRODUCTION MEETING.
STEEL MAKING: Electric Arc Furnace, Ladle Analysis.
ROUND BARS PRODUCTION: Visual Check and Verify Stamping and Stenciling of Heat number on each bar.
ROLLING FTM MILL: Check mill practice the operation of end cropping, dimensional and surface check.
seamless steel tube
seamless tubing
seamless pipes
seamless pipe manufacturers
stainless steel pipe manufacturers
stainless steel 316 – gas fittings
gas pipes
gas line pipe
gas tubing
seamless steel pipe manufacturing process
gas natural on line